Search for more Public Notices in your area
Traffic

ROAD TRAFFIC REGULATION ACT 1984 AS AMENDED BY THE ROAD TRAFFIC (TEMPORARYRESTRICTIONS) ACT 1991 SECTION 14(1) TEMPORARYWATING AND LOADING RESTRICTIONS, DISABLED BAYS

Notice ID: MF0558463

Notice effective from
25th June 2020 to 25th July 2020

LONDON BOROUGH OF BARNET

ROAD TRAFFIC REGULATION ACT 1984 AS AMENDED BY THE ROAD TRAFFIC (TEMPORARYRESTRICTIONS) ACT 1991 SECTION 14(1) TEMPORARYWATING AND LOADING RESTRICTIONS, DISABLED BAYS

AND AMBULANCE BAY THIRLEBY ROAD HA8

The BARNET LONDON BOROUGH COUNCIL HEREBYGIVE NOTICE that owing for the need to facilitate access and egress for construction traffic into Hanshaw Drive and for the replacement of provisions originally located on Hanshaw Drive, they intend to make an Order which will:

1. temporarily introduce 'At any time' waiting and loading restrictions on the south side of Thirleby Road HA8, from apoint opposite the common boundary of Nos. 16 and 18 Thirleby Road to apoint 25 metres south-west of that point, while the works take place



2. temporarily introduce an ambulance bay, operational 'At any time' the north side of Thirleby Road HA8, between apoint 7metres south-west of the south-west kerbline of Hanshaw Drive and apoint 18.8 metres south-west of that point, while the works take place.



3. temporarily introduce adisabled permit holders only parking bay,operational



'At any time' on the north side of Thirleby Road HA8, between apoint 25.5 metres south-west of the south-west kerbline of Hanshaw Drive and apoint 5.4 metres south-west of that point, while the works take place.

4. temporarily introduce adisabled permit holders only parking bay,operational



'At any time' on the north side of Thirleby Road HA8, between apoint 30.9 metres south-west of the south-west kerbline of Hanshaw Drive and apoint 5.4metres south-west of that point, while the works take place

5. temporarily introduce adisabled permit holders only parking bay,operational



'At any time' on the north side of Thirleby Road HA8, between apoint 36.3 metres south-west of the south-west kerbline of Hanshaw Drive and apoint 5.4metres south-west of that point, while the works take place. The Order will commence at 8.00am on Monday 6th July 2020 and is expected to last for 18 months.

Nothing in the above paragraphs shall apply to anything done with the permission of or at the direction of aPolice Constable or aTraffic Warden in uniform.

Further information may be obtained by contacting Highways Service, London Borough of Barnet, Tel020 8359 3555.

Dated this 25th June 2020

Geoff Mee,

Interim Executive Director (Environment) 2Bristol Avenue, Colindale, London, NW9 4EW

Attachments

MF0558463.pdf Download

London Borough of Barnet

North London Business Park , Oakleigh Road South , London , N11 1NP

http://www.barnet.gov.uk/ 020 8359 2000

Comments


or Register to leave a comment and/or receive comment alerts.

Related notices