Search for more Public Notices in your area
Traffic

THE HARINGEY (PHILIP LANE, JANSONS ROAD, NAPIER ROAD, ARNOLD ROAD) (TEMPORARY PROHIBITION AND RESTRICTION OF TRAFFIC) ORDER 2021

Notice ID: WAT2198219

Notice effective from
15th September 2021 to 15th October 2021

TMO 139 14(1)
THE HARINGEY (PHILIP LANE, JANSONS ROAD, NAPIER ROAD, ARNOLD ROAD) (TEMPORARY PROHIBITION AND RESTRICTION OF TRAFFIC) ORDER 2021 NOTICE IS HEREBY GIVEN THAT the Council of the London Borough of Haringey has made the above Temporary Traffic Order as described below under S14(1) Road Traffic Regulation Act 1984 as amended:-THE GENERAL EFFECT OF THE ORDER:
1. To temporarily close Jansons Road from its junction with the southern kerb-line of Philip Lane, south for 24.5 metres on 20th of September 2021 for 6 weeks.
The alternative route will be via Philip Lane, Lawrence Road, Clyde Road and vice versa.
2. To temporarily suspend any parking places or waiting restrictions at the following locations and replace with temporary no waiting/ no loading at any time:
Lengths of Roads__Phase
Jansons Road EAST SIDE: From a point 9 metres south of the southern kerb-line of Philip Lane, south for 15.5 metres.
Jansons Road WEST SIDE: From a point 9 metres south of the southern kerb-line of Philip Lane, south for 24.2 metres.
1
Philip Lane NORTH SIDE: from the shared property boundary of No.134/136, west for 36.3 metres.
1
Napier Road EAST SIDE: from a point 11 metres north of 1 the northern kerb-line of Philip Lane, north for 16.8 metres.
Napier Road WEST SIDE: from a point 14.5 metres north of the northern kerb-line of Philip Lane, north for
11.6 metres.
1
Arnold Road EAST SIDE: from a point 4.6 metres north of the northern kerb-line of Philip Lane, north for
43.7 metres to a point in line with the shared property boundary of No.1/3 Arnold Road.
Arnold Road WEST SIDE: from a point 8.5 metres north of the northern kerb-line of Philip Lane, north for 38.3 metres to the shared property boundary of No.1/3 Arnold Road.
2

The temporary traffic measures under this notice will commence on the following dates: Phase 1 - 20th of September 2021 for 6 weeks, Phase 2 - 11th of October 2021 for 6 weeks and are required to facilitate the Philip Lane CS1 Cycling improvements works.
The provisions of this order shall apply only at such times and as directed by traffic signs prescribed by the Traffic Signs Regulations and General Directions 2016. Any vehicle waiting in contravention of any restriction imposed by the Notice may be removed under the provisions of the Removal and Disposal of Vehicles Regulations 1986. If you suspect that your vehicle has been towed away you can call TRACE Customer Services Helpdesk 0300 077 0100.
For more information call 0208 489 1300 or visit our website at www.haringey.gov.uk/traffic_orders
Dated: 15th September 2021
Ann Cunningham
Head of Highways & Parking

Attachments

WAT2198219.pdf Download

London Borough of Haringey

Comments


or Register to leave a comment and/or receive comment alerts.

Related notices